1. An appointment must be made with a JWEMC Engineer to discuss the design, layout, and scheduling of the project. Since these are only general specifications, the Engineer may modify the specifications based on individual project requirements.
  2. Underground facilities may not be feasible for locations with considerable rock
  3. A plan of the subdivision shall be furnished to the Engineer before the initial meeting in both paper and electronic formats.