- An appointment must be made with a JWEMC Engineer to discuss the design, layout, and scheduling of the project. Since these are only general specifications, the Engineer may modify the specifications based on individual project requirements.
- Underground facilities may not be feasible for locations with considerable rock
- A plan of the subdivision shall be furnished to the Engineer before the initial meeting in both paper and electronic formats.