An inspection by the Engineer shall verify that these specifications are met. The developer/contractor shall set up an appointment with the Engineer for an inspection before any conduit is covered. JWEMC reserves the right to require the developer/contractor to excavate portions or all of the installation if necessary to assure conformity.
No conductor will be pulled before passing this visual inspection. This visual inspection is not the final acceptance of the installation. Final acceptance occurs after the conductor is pulled and energized.