• An inspection by the Engineer shall verify that these specifications are met. The developer/contractor shall set up an appointment with the Engineer for an inspection before any conduit is covered. JWEMC reserves the right to require the developer/contractor to excavate portions or all of the installation if necessary to assure conformity.
  • No conductor will be pulled before passing this visual inspection. This visual inspection is not the final acceptance of the installation. Final acceptance occurs after the conductor is pulled and energized.