- September 2023 Time-of-Use General Power Rate – Schedule TGSA (PDF)
- September 2023 Manufacturing Service Rate – Schedule TDMSA (PDF)
- September 2023 General Power Rate Schedule – Schedule TDGSA (PDF)
- September 2023 Manufacturing Service Rate – Schedule MSD (PDF)
- September 2023 Manufacturing Service Rate – Schedule MSC (PDF)
- September 2023 Manufacturing Service Rate – Schedule MSB (PDF)
- September 2023 General Power Rate – Schedule GSD (PDF)
- September 2023 General Power Rate – Schedule GSC (PDF)
- September 2023 General Power Rate – Schedule GSB (PDF)
- September 2023 General Power Rate – Schedule GSA (PDF)
Commercial/Non-Residential Rates
- October 2023 General Power Rate – Schedule GSA (PDF)
- October 2023 General Power Rate – Schedule GSB (PDF)
- October 2023 General Power Rate – Schedule GSC (PDF)
- October 2023 General Power Rate – Schedule GSD (PDF)
- October 2023 Manufacturing Service Rate – Schedule MSB (PDF)
- October 2023 Manufacturing Service Rate – Schedule MSC (PDF)
- October 2023 Manufacturing Service Rate – Schedule MSD (PDF)
- October 2023 General Power Rate – Schedule TDGSA (PDF)
- October 2023 Manufacturing Service Rate – Schedule TDMSA (PDF)
- October 2023 Time-of-Use General Power Rate – Schedule TGSA (PDF)
Commercial/Non-Residential Fees
New Service Job Cost – Commercial/Industrial – Total Job cost
Commercial Deposit (based on prior usage history) – equal to twice the highest bill
Financing Available for Excellent Credit Customers
- $501 to $1,000 up to 12 months prime + 5%
- $1001 to $2,500 up to 24 months prime + 5%
- $2501 to $5,000 up to 36 months prime + 5%
- $5000 and above up to 48 months prime + 5%
New construction to Subdivisions and Mobile Home Parks
- Job Cost = $400 per lot or rental space
Meter Testing
- Commercial-200 Amp $60
- Commercial-CT Rated $120
Meter tampering
- $200 plus estimated power consumed
Meter Locking Device – $50
Late Payment Penalty – 5% of bill
Collection Fee – $25
Reconnection Fee
- Normal Hours 7:30 a.m. to 4:30 p.m. – $50
- After Hours – $100
Returned check fee – $30
- Trouble Call $50 (if the issue is not with JWEMC equipment or lines)
Relocation of Service – Total Job Cost
Trailer Service Pole Rental – $10
Rental TSP Sale Price
- 100 amp – Conduit – $65
- 100 amp – Cable – $130
- 200 amp – Conduit – $75
- 200 amp – Cable – $150
- ($30 credit applied to account when member replaces existing pole)
TV Cable Connection Fee – Job Cost
Analog Meter Reading Fee – $50 per Month
Security Lights
- Connect existing light – $25
- Light added to existing pole – $75
- JWEMC furnishes pole and light – $425
- Add transformer for light additional – $350
- 250 watt HPS additional – $160
- span of duplex for light additional – $150
- Security Light Pole Rental – $2
On commercial accounts, an appointment must be made with a JWEMC engineer to discuss the design, layout, and scheduling. Individual project requirements will determine the project design. Please contact Joe Wheeler EMC’s engineering department to help you with your specific commercial application. Contact us for questions or to make an appointment.
We also work closely with the city building departments within our membership area.
City Building Departments
Decatur: (256) 341-4570
Hartselle: (256) 773-2535
Trinity: (256) 353-2474